function _node_mass_update_batch_finished
Same name in other branches
- 9 core/modules/node/node.admin.inc \_node_mass_update_batch_finished()
- 8.9.x core/modules/node/node.admin.inc \_node_mass_update_batch_finished()
- 10 core/modules/node/node.admin.inc \_node_mass_update_batch_finished()
- 11.x core/modules/node/node.admin.inc \_node_mass_update_batch_finished()
Implements callback_batch_finished().
Reports the status of batch operation for node_mass_update().
Parameters
bool $success: A boolean indicating whether the batch mass update operation successfully concluded.
int $results: The number of nodes updated via the batch mode process.
array $operations: An array of function calls (not used in this function).
1 string reference to '_node_mass_update_batch_finished'
- node_mass_update in modules/
node/ node.admin.inc - Make mass update of nodes, changing all nodes in the $nodes array to update them with the field values in $updates.
File
-
modules/
node/ node.admin.inc, line 384
Code
function _node_mass_update_batch_finished($success, $results, $operations) {
if ($success) {
drupal_set_message(t('The update has been performed.'));
}
else {
drupal_set_message(t('An error occurred and processing did not complete.'), 'error');
$message = format_plural(count($results), '1 item successfully processed:', '@count items successfully processed:');
$message .= theme('item_list', array(
'items' => $results,
));
drupal_set_message($message);
}
}
Buggy or inaccurate documentation? Please file an issue. Need support? Need help programming? Connect with the Drupal community.